We fit the equipment that keeps a home warm, cool and running.

Gas boilers, split systems, water underfloor heating, supply ventilation, inverters and back-up power. Fitted, commissioned and serviced. Vinnytsia, since 2013.

Why the sizing matters

Equipment is rarely the problem. The sizing is.

A nine kilowatt boiler in a house that needs fourteen. It works perfectly in October, and in the first genuinely cold week of January it cannot keep up, and everybody blames the boiler. The boiler is fine. Nobody calculated the heat loss before buying it.

The same happens with an air conditioner chosen from floor area alone, with no regard for which way the windows face or how many people are in the room. And with sockets marked out before anyone asked where the wardrobe was going to stand.

So we start with numbers rather than with a catalogue: heat loss, electrical load, pipe diameter, cable section. It is half a day of work, and it decides whether the next fifteen years are comfortable or irritating.

We have worked in Vinnytsia since 2013: heating, air conditioning, ventilation, underfloor heating, electrical work and back-up power. The same crew that installs a system comes back to service it.

There is a counter at the workshop, and it exists for a practical reason rather than an ambitious one. A fitting nobody can find on a Saturday stops a job on Monday. If you need one valve rather than a box of ten, come in and take one.

If the calculation says your idea will not work, we say so before taking any money. We would rather lose the order than be the people who installed a system that cannot heat the house.

01

Boilers and heating

Wall-hung and floor-standing gas boilers, solid fuel and electric. The pipework around them, radiators or underfloor loops, the flue, the safety group and the expansion vessel.

Output is calculated from the heat loss of the building, not from its floor area. The difference between 24 kW and 18 kW is not only the price on the box: an oversized boiler short-cycles, wears its heat exchanger out faster and burns more gas doing it.

Sized room by room from heat loss, not from the rule of thumb about one kilowatt per ten square metres.
Pipework with a safety group, a filter and isolating valves, so a service call does not mean draining the whole system.
The flue built to the boiler's own specification: coaxial or twin pipe, with a fall and a condensate drain.
Commissioned with the weather compensation curve actually set up, not switched on and left at the factory numbers.
A wall-hung combi gas boiler fitted in a domestic utility corner

Fitted and commissioned

02

Air conditioning

Split and multi-split systems, inverter and on/off. Indoor and outdoor units, the copper line set, the drain, the vacuum and the start-up.

A unit is chosen from the volume of the room, the glazing, the floor it is on and how many people are in it. A 2.5 kW unit in a south-facing room with a full-height window will not cope, and the name on the box is not what went wrong.

The line set is run before the finishes if the renovation is still going. Afterwards it ends up in a trunking box down the corner of the room.
The drain falls to a soil pipe or outside, with a trap. Condensate is about a litre an hour, and it has to go somewhere deliberate.
Evacuated with a vacuum pump, not purged with refrigerant. Moisture left in the circuit is what kills a compressor two summers later.
A low-ambient kit if the unit is meant to heat through the winter rather than only cool through the summer.
The indoor unit of a wall-mounted split air conditioning system

Split and multi-split

03

Underfloor heating

Wet and electric. The manifold, the loops, the thermostats, the pressure test, and staying on site while the screed goes down.

Wet is cheaper to run and makes sense as soon as there is a boiler. Electric is for the case where only the bathroom or the kitchen needs it and there is nowhere sensible to run pipe to.

Pipe spacing is worked out per room: closer along the external wall and under the glazing, wider through the middle where nobody stands.
No loop longer than ninety or a hundred metres, because past that the pump cannot push water round it evenly.
Pressure tested before the screed is poured and left under pressure while it is poured, which is how a nail through a pipe gets found the same day.
The floor sensor goes into a conduit, so it can be replaced one day without breaking up the floor to reach it.
Underfloor heating loops clipped out across a room before the screed is poured

Wet and electric

04

Ventilation

Supply and extract with heat recovery, ducted kitchen extract, single-room units. The ducts, the diffusers and the controls that decide when any of it runs.

After the windows are replaced a flat stops breathing: the moisture has nowhere to go and mould turns up on the reveals within a season. The windows are not the problem. The natural supply air that used to leak in around the old ones has gone, and nothing replaced it.

A heat recovery unit returns most of the warmth in the air it throws out, and in a Vinnytsia winter that shows up on the gas bill.
Ducts go into the ceiling void before the ceiling does. Afterwards the only route left is a bulkhead across the room.
Kitchen extract is taken out separately from the general system, or what you cooked arrives at the neighbours.
Filters go somewhere a person can actually reach, because they have to be changed twice a year rather than forgotten permanently.
Insulated ducts and pipework running from a heat recovery unit in a plant room

Supply, extract, recovery

05

Back-up power and electrics

An inverter with batteries, a voltage stabiliser, changeover automation, the distribution board and the wiring behind all of it.

When the power goes off to a schedule, the question is not whether to fit a back-up but what it has to hold up. A gas boiler and a router is one calculation. A boiler, a fridge and a well pump is a completely different one, and the honest answer usually costs more than the round number people arrive with.

We start from the list of what actually has to keep running. The inverter rating and the battery capacity follow from that list, not from a price bracket.
A gas boiler runs off a pure sine wave inverter. On a modified sine wave the control board will not start, and often it will not survive the attempt.
The board is built with every circuit labelled and the drawing left inside the door, so the next person has something to read.
Earthing is tested with an instrument rather than judged by eye, and old aluminium wiring is replaced rather than extended.
A distribution board with each circuit breaker labelled and the wiring dressed

Inverters and boards

How a job runs

Five stages, and the first one is arithmetic.

Nothing here is unusual. What separates a system that works from one that irritates you for years is that somebody did the first stage properly and nobody cut the fourth.

01

Survey and calculation

Heat loss room by room, electrical load, water demand, and where the units can physically go. We need the walls, the glazing, the orientation and how the place is actually used. Half a day, and everything after it depends on those numbers being right.

02

Layout and itemised estimate

What goes where, what runs where, and what each part costs, in one document you can remove lines from. Routes are agreed with whoever is doing the finishes now, because a chase in the wrong wall is free to move on paper.

03

First fix

Pipe, duct and cable, photographed before anything is closed up, so that in five years somebody knows what is inside the wall. Pressure tests happen here, while what they find is still cheap to fix.

04

Second fix and commissioning

Units on the wall, board live, system filled and balanced, circuit vacuumed, curves and thermostats set for how you will really use it. This is the stage that gets cut when a job runs late, and cutting it is why a correctly sized system still heats one room and not another.

05

Service

The same people come back. Not as a nice thing to say: whoever installed a system can diagnose it in ten minutes where a stranger needs two hours. Boiler and recovery unit service is scheduled rather than waited for.

A valve being set by hand during commissioning
Stage four: balancing. The step that gets skipped when a job runs late.

What the figure rests on

What decides the price.

There is no price per square metre here, because that number is what causes most of the disappointment in this trade. Here is what the figure actually rests on.

The calculation, not the square metres

Two flats of the same size can need very different systems. A corner flat with three external walls and north-facing glazing loses far more heat than one in the middle of a block, and the boiler, the radiators and the running cost all follow from that.

The routes, not the boxes

The equipment is usually the predictable part. What varies is getting pipe, duct and cable from where they start to where they have to end: through what, across what, and how much has to be opened up and made good again afterwards.

An empty shell or a home somebody lives in

The same installation costs less in a bare shell than in a flat with furniture in it. Dust protection, working hours that suit the neighbours and finishes that already exist all add real hours, and they are stated as their own line rather than buried in a rate.

Who buys the equipment

You can buy it or we can, and the two produce different figures. There is one condition either way: we will not install equipment the calculation says is the wrong size, whoever paid for it, because the complaint afterwards arrives at our door regardless.

Everything is agreed before we start

The estimate is itemised, so you can see what each part costs and take any of it out. If we open a wall and find something nobody could have known about, we stop and call rather than carry on and add it to the invoice at the end.

Asked on the first visit

The ones we are asked on the first visit.

Nobody can say from the area alone, and the rule of thumb about one kilowatt per ten square metres is how most undersized systems get bought. It depends on the walls, the glazing, the orientation and the ventilation. The calculation is not expensive and it is the only honest answer anyone can give you.

Yes, and plenty of people do. Send us the model before you order it, because the one thing we will not do is install equipment the calculation says is the wrong size. It is not about the margin. It is that the complaint afterwards arrives at our door regardless of who bought the box.

It depends on the floor build-up, the ceiling height and how quickly you want a room to respond. Underfloor is comfortable and slow; radiators are quicker and take wall space. In a lot of flats the right answer is both, in different rooms, and that is a decision to make at the calculation rather than on site with the screed arriving.

Usually yes, and it will cost more and look like a compromise, because the line set and the condensate have to run somewhere visible. If the renovation has not started, this is the single cheapest decision you can bring forward: an hour of planning now saves a trunking box down the corner of the room for the next fifteen years.

That is the first thing to decide, because the price follows from it. A gas boiler, its controls and a router draw very little, and a small inverter with one battery will carry them through a long outage. Add a fridge and a well pump and you are into a bigger inverter and two or three batteries. Tell us what must not go off, and we will price that rather than a round number.

A flat with heating and electrics is a matter of weeks rather than days, split into first fix and second fix with the other trades in between. We give dates at the estimate and we tell you which of them depend on somebody else finishing first, because those are the ones that actually slip.

Yes, and the practical reason is worth more than the promise: we photographed the first fix before it was closed up and we have the drawing of what is where. Diagnosing our own installation takes minutes. That record is the main thing you are buying and it is why we keep it.

Where it starts

Start with the calculation.

Tell us the address, the area, what the walls are made of and what you want fitted. If you do not know some of it, say so. The first conversation costs nothing and it is the one that decides everything else.

Useful to have to hand

The floor area and the ceiling height, and how many external walls the rooms have.
What the walls are built of and whether they are insulated, even approximately.
The glazing: how many windows, how big, and which direction they face.
Whether there is gas, and what the electrical supply into the building is.
If you want a back-up: the list of what must not switch off when the power does.

If you do not know some of these, say so. Half of them we can measure ourselves on the first visit, and none of them are a reason to put off the call.

Schematic plan of the block around the Stakhurskoho Street workshop vul. Stakhurskoho No. 2

Where to find us

2 Stakhurskoho Street, apartment 70, Vinnytsia, 21027. The drawing is a sketch for orientation rather than a survey; call before you come and somebody will meet you at the door.

Address 2 Stakhurskoho Street, apt. 70, Vinnytsia, 21027, Ukraine
Company IDEAL KLIMAT, working since 2013
Area Vinnytsia and the surrounding district. Further afield by arrangement, once the calculation says the job is worth the travel.